Long Electric is a truly diversified electrical contractor. To get an idea of some of the past projects that we have completed, please visit a project portfolio below.”

Valley Transit Authority (VTA)

View Project »

Location: San Jose, Ca

General Contractor: Ghilotti Construction

Description: In 2016, Ghilotti Construction contracted Long Electric to perform intersection modifications for the Valley Transportation Authority (VTA) in San Jose, Ca.

BioMarin Backfill Phase 2

View Project »

Location: Novato, Ca

General Contractor: Dome Construction

Description: In 2016/2017 Long Electric was contracted to perform electrical construction to support the modifications of several lab spaces across two (2) floors at 95 Digital Drive, 300 Bel Marin Keys and 46 Galli Drive.

Calistoga Elementary School Modernization

View Project »

Location: Calistoga

General Contractor: Blach Construction

Description: Summer of 2015, Long Electric performed the electrical modernization at Calistoga Elementary School as well as all of the electrical work for the HVAC replacement at Calistoga High School. Scope of work included: full electrical (power, lighting, data, audio visual, HVAC power and fire alarm) renovation of eight (8) existing classrooms, installation of a new campus wide Fire Alarm system and removal and re-installation of existing power raceways to accomodate the replacement of the existing roof.

Northgate High School, New Aquatic Center

View Project »

Location: Walnut Creek, Ca

General Contractor: Taber Construction

Description: The New Aquatic Center at Northgate High School in Walnut Creek, CA included new construction of three (3) buildings: Sports Medicine, Mechanical Building and Restrooms, along with an olympic sized swimming pool and stadium lighting.