Tri-Delta Transit Authority – Antioch Charging Stations


Location: Antioch, Ca

Contract Amount:

General Contractor: Long Electric

Description:

In 2017, Long Electric contracted with the Tri-Delta Transit Authority to perform the installation for four (4) new electric bus charging stations and two (2) electric vehicle charging stations. To support the new charging stations a new 1200 amp electrical service was required. Long performed the installation of the new service and all of the associated electrical infrastructure for the project. The project was performed within the project schedule and budget and with no recordable lost time incidents.

#1 in safety for 6 years running

Our Safety Record »