Kaiser Oncology Center – San Rafael


Location: San Rafael, CA

Contract Amount:

General Contractor: Rudolph & Sletten

Description:

In 2016/2017, Long Electric teamed with Rudolph & Sletten to perform the build-out of a new Oncology and Infusion Clicnic for Kaiser Permanente in San Rafael, Ca.  The project scope included the design and build of new offices, exam rooms, pharmacy, and a new elevator in an existing two-story 11,000 sq. ft. building shell.  Some of the electrical scope included: new power distribution, code compliant lighting and lighting controls, security, fire alarm, sound masking, nurse call, public address system and the installation of a new 150 kVa emergency generator.  The delivery method for this project is Design-Build and Long Electric completed the project safely and with no recordable lost time incidents. The project is currently under review for LEED Gold certification

 

 

#1 in safety for 6 years running

Our Safety Record »