Client: 4D Molecular Therapeutics

Location: Emeryville, CA

General Contractor: Dome Construction

This project was completed on time and without safety incidents.

In 2019, Long Electric teamed with Dome Construction to perform an office tenant improvement and lab upgrade at 4D Molecular in Emeryville, California. Long Electric performed both the electrical design and build for new power, as well as fire alarm, lighting and lighting controls installation for the project. The project was completed safely, within the project schedule and without safety incidents.