Outside view of Orca Bio building

Orca Bio West Coast GMP Facility

Home » Jobs » Orca Bio West Coast GMP Facility

Project Details

Client:

Orca Bio

Location:

Sacramento, CA

General Contractor:

This design-build opportunity had many intricate, detailed systems. It was imperative to work with a sensitivity for precision and detail, and thankfully, that is what we do best.

We performed an office tenant improvement and lab expansion with a full upgrade of existing PGE main switchboard. This project also included installation of new air handler units, exhaust fans, and various mechanical equipment to support the lab expansion.

In 2023, Long Electric successfully completed this cutting-edge electrical construction project at Orca Bio West Coast in Sacramento, CA, enhancing their infrastructure in a 100,000 sqft. laboratory to support research in high-precision cellular therapy. Long Electric performed the electrical design and installation including new power distribution systems, uninterruptible power supplies (UPS), energy efficient lighting and lighting controls, fire alarm and low voltage infrastructure to ensure seamless operation and safety compliance within the research facility. Long Electric’s team completed the project safely and within schedule and budget.

Site by Colleen LeMasters Creative